ERP for Pump & Valve Manufacturers
From casting to dispatch — one cloud platform for Indian pump and valve makers. Multi-level BOMs for every model and material, foundry & machining job-work with ITC-04, serial traceability, weight-based costing and GST e-invoicing.
Why pump & valve shops outgrow Tally and Excel
A pump is not one item — it is an assembly of a casing, impeller, shaft, bearings, mechanical seal, motor and a fistful of fasteners, frequently built in three materials of construction (cast iron, stainless steel, bronze) and several HP ratings. The moment you try to quote, cost and plan that in Tally plus spreadsheets, four things break:
Multi-level BOMs & MOC variants
The same model in CI, SS304 and bronze is three different cost structures. Single-level BOMs can’t explode sub-assemblies or roll up cost.
OEMup: multi-level BOMs with model + material variants and automatic roll-up costing. See how →Weight-based raw-material cost
Castings and bar stock are bought by weight but designed by dimension. Pricing CI vs SS by hand is slow and error-prone.
OEMup: built-in metal-weight costing in the item master. Try the free weight calculator →Foundry & machining job-work
Castings go out to a foundry; parts go out for machining and plating. Tracking that for ITC-04 in spreadsheets fails audits.
OEMup: Rule-55 challans, e-way bills and ITC-04 reconciliation built in. Job-work software →Serial traceability & test certs
Pumps ship with serial numbers, test certificates and warranty obligations. A register can’t link a serial to its batch and dispatch.
OEMup: serial & batch tracking from work order to dispatch, with full genealogy.One platform, casting to dispatch
OEMup covers the whole pump-shop workflow — no stitched stack, no per-machine installs, India-first GST defaults out of the box:
- Multi-level BOMs with phantom & alternate parts
- Model & material-of-construction variants
- Weight-based raw-material costing
- Quotation → Sales Order → Work Order → Dispatch
- Foundry / machining job-work + ITC-04
- MRP — what to buy and build, by when
- Serial / batch / test-certificate traceability
- Multi-warehouse & sub-assembly WIP
- GST: e-invoice, e-way bill, GSTR-1/3B/9
- HRMS, attendance & shop-floor payroll
- Spares & after-sales order tracking
- Cloud access on mobile, desk and shop floor
Evaluating against your current system? See the honest OEMup vs Tally comparison, or the 5 best Tally alternatives for Indian manufacturers.
Pump & valve ERP — FAQ
Why do pump manufacturers outgrow Tally and spreadsheets?
A pump is a multi-level assembly in several materials of construction. Tally and single-level spreadsheets can’t explode that BOM, cost a model through its sub-assemblies, or track foundry/machining job-work for ITC-04. A manufacturing ERP does all three.
Can OEMup handle the same pump in different materials (CI, SS, bronze)?
Yes — multi-level BOMs with model and material-of-construction variants, so each material rolls up its own weight-based cost automatically.
Does OEMup handle foundry and machining job-work with ITC-04?
Yes — castings and machined parts sent out are tracked with Rule-55 challans, e-way bills and ITC-04 reconciliation built in.
Is OEMup actually used by a pump manufacturer?
Yes — OEMup is in production at Alfa Pumps, one of our five launch manufacturers, alongside Chemoro, Airmake, Innox and Orfom.
Other industries: Plastic Manufacturing · Fabrication & Sheet Metal · Auto Components
See OEMup on your own pump BOM
Book a free 30-minute demo — bring one pump model and we’ll build its multi-level BOM, cost it by material, and show the job-work + GST flow. Or leave your details and we’ll send pricing for your team size.