ERP for Plastic & Moulding Manufacturers
From granule to dispatch — one cloud platform for Indian plastics and injection-moulding makers. BOMs by mould, cavity and material grade, weight-based granule costing with regrind, moulding & printing job-work with ITC-04, batch traceability and GST e-invoicing.
Why plastics & moulding shops outgrow Tally and Excel
A moulded part is not one fixed item — it is defined by its mould and cavity count, its polymer grade (PP, ABS, nylon, PC) and its masterbatch colour, and it is built from material bought by the kilo but consumed by shot weight. The moment you try to quote, cost and plan that in Tally plus spreadsheets, four things break:
BOM by mould, cavity & grade
The same part in PP, ABS or nylon — or a different masterbatch colour — is a different cost structure. Single-level BOMs can’t carry mould/cavity or roll up cost.
OEMup: multi-level BOMs with mould, cavity and material-grade variants, with automatic roll-up costing. See how →Weight-based granule costing
Granules are bought by the kg but priced by shot/part weight, plus runner scrap and regrind. Costing each part by hand is slow and error-prone.
OEMup: shot/part-weight costing with runner scrap % and regrind in the item master. Try the free weight calculator →Moulding, printing & plating job-work
Material goes out for moulding; parts go out for printing, plating or assembly. Tracking that for ITC-04 in spreadsheets fails audits.
OEMup: Rule-55 challans, e-way bills and ITC-04 reconciliation built in. ITC-04 guide →Batch & lot traceability
Parts ship in lots tied to a shift, machine and material batch. When a recall or rejection hits, a register can’t link a lot to its genealogy.
OEMup: batch & lot tracking by shift, machine and material batch — full genealogy from granule to dispatch.One platform, granule to dispatch
OEMup covers the whole moulding-shop workflow — no stitched stack, no per-machine installs, India-first GST defaults out of the box:
- Multi-level BOMs with moulds & cavity counts
- Material-grade & masterbatch-colour variants
- Weight-based granule costing (shot/part weight)
- Cycle-time & scrap / regrind % per part
- Quotation → Sales Order → Work Order → Dispatch
- Moulding / printing / plating job-work + ITC-04
- MRP — what to buy and mould, by when
- Batch / lot traceability with genealogy
- Multi-warehouse & sub-assembly WIP
- GST: e-invoice, e-way bill, GSTR-1/3B/9
- HRMS, attendance & shop-floor payroll
- Cloud access on mobile, desk and shop floor
Evaluating against your current system? See the honest OEMup vs Tally comparison, or the 5 best Tally alternatives for Indian manufacturers.
Plastics & moulding ERP — FAQ
Why do plastic manufacturers outgrow Tally and spreadsheets?
A moulded part is defined by its mould, cavity count, polymer grade and colour, and is costed by shot weight with scrap and regrind. Tally and single-level spreadsheets can’t explode that BOM, cost a part by shot weight, or track moulding/printing job-work for ITC-04. A manufacturing ERP does all three.
Can OEMup handle the same part in different polymers, grades and colours?
Yes — multi-level BOMs with mould, cavity and material-grade variants, so each grade or masterbatch colour rolls up its own weight-based granule cost automatically.
Does OEMup handle weight-based granule costing and regrind?
Yes — material is bought by the kg and costed into each part by shot/part weight, with runner scrap % and regrind handled in the BOM so the costed weight reflects what actually melts in.
Does OEMup handle moulding and printing job-work with ITC-04?
Yes — material or parts sent out for moulding, printing, plating or assembly are tracked with Rule-55 challans, e-way bills and ITC-04 reconciliation built in.
Other industries: Pumps & Valves · Fabrication & Sheet Metal
See OEMup on your own part BOM
Book a free 30-minute demo — bring one part or mould and we’ll build its BOM, cost it by shot weight and grade, and show the job-work + GST flow. Or leave your details and we’ll send pricing for your team size.